Raw Thrills arcade systems logoArcade floor · service · acceptance

Raw Thrills Arcade Floor Engineering Services

Model-specific drawings, payment and network boundaries, signed software records, field tests, and operator acceptance—without treating a reference specification as a site approval.

Two-Column Engineering Scope

Service tierDocumented scope
Cabinet layoutSelected-model footprint, player stance, aisle, egress, loading path, ventilation, acoustics, and service-door travel.
ElectricalNameplate voltage, branch circuit, startup condition, isolation point, grounding, and local inspection owner.
PaymentCoin-op / cashless card system, bill validator or coin comparator, reader wiring, pricing table, meters, refund path, and reconciliation.
NetworkManaged Ethernet or approved Wi-Fi, VLAN, remote-access owner, event logs, time source, outage behavior, and recovery test.
Game interfaceJAMMA harness or model-specific interface, controls, display, audio, lighting, payout peripherals, and approved replacement parts.
Release controlSoftware package, hash, configuration register, staged sample, rollback media, exception record, and operator approval.

Four-Step Acceptance Method

  1. 1 · Bench reviewFreeze model, software, peripherals, payment path, voltage, and network state.
  2. 2 · Site verificationMeasure clearances and services; log deviations before energization.
  3. 3 · Controlled runTest boot, controls, payment, interrupted play, payout, meters, alerts, and recovery.
  4. 4 · Sign-offAttach results, exceptions, corrective action, retest, training record, and responsible parties.

Request Raw Thrills Model-Level Engineering Documents

Availability and approval scope depend on the selected product, revision, destination market, operator architecture, and responsible legal entity.