Cabinet Envelope
Record selected-model dimensions, door swing, player stance, aisle, egress, and component-removal clearance.
Map cabinet footprint, 120V or 220V branch power, managed Ethernet, cashless or coin-op interfaces, service clearance, and acceptance checks before equipment arrives.
Record selected-model dimensions, door swing, player stance, aisle, egress, and component-removal clearance.
Confirm nameplate voltage, branch circuit, startup load, isolation point, and local electrical review.
Assign the bill validator, coin comparator, card reader, pricing table, reconciliation, and outage behavior.
Document managed Ethernet or Wi-Fi scope, VLAN ownership, remote access, logs, and recovery tests.
Freeze ticket payout ratio, prize-economy inputs, meter checks, and change-control responsibility.
Test boot, controls, display, sound, payment, interrupted play, meters, alerts, and rollback.
| Reference envelope | 900 × 1,800 × 2,400 mm is an industry planning example only; use the selected-model drawing. |
|---|---|
| Site checks | Loading path, floor load, player zone, egress, sightlines, acoustics, ventilation, and service-door travel. |
| Payment | Coin-op / cashless card system, validator or reader, pricing table, meters, refunds, and reconciliation. |
|---|---|
| Network | Managed Ethernet, approved remote access, time synchronization, event logs, firmware package, and rollback media. |
| Applicable reviews | UL electrical safety and FCC Part 15 may apply by exact model and radio configuration; local approval remains separate. |
|---|---|
| Acceptance pack | Configuration register, test conditions, observed results, exceptions, corrective action, retest, and operator sign-off. |

Balance anchors, redemption dwell time, party circulation, cashless integration, prize-counter flow, and technician access.

Control noise, sightlines, opening hours, staffing, adjacent tenants, and recovery behavior during network interruption.
These labels identify possible evidence paths, not blanket Raw Thrills certifications. Confirm the legal entity, model, revision, market, issuer, and validity before publication or procurement.
Bring the measured plan, machine mix, operating hours, payment architecture, network owner, staffing assumption, and opening window.